Transom (Bearer):

Transom (Bearer):

Transom

-Place the transom inside the standard & over the ledger.

-Transom must be fitted with a fixed clamp.

-Transom pipe is to be installed every 1.5m below the platform.

-Minimum overhang from the ledger = 50mm

-Maximum overhang from the ledger = 150mm.

– Put the plank on the transom which bears the weight of the working platform.

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top