Bracing:
Bracing: -It is a diagonally tube that makes the scaffold structure strong & stable. Longitudinal (Façade) Diagonal Bracing Tube and […]
Bracing: -It is a diagonally tube that makes the scaffold structure strong & stable. Longitudinal (Façade) Diagonal Bracing Tube and […]
Transom (Bearer): -Place the transom inside the standard & over the ledger. -Transom must be fitted with a fixed clamp.
Ledgers/Runners: -Ledger should be 180 degree (Horizontal brace) -Ledger/Transom should be fixed inside the standards. -Only fix clamp use to
Standards / Post / Vertical / Upright: – Standards should be perpendicular (Use Spirit Level). – The whole weight of
Tubes: – Outer diameter of scaffold pipe = 48.3mm – Before Use, check it properly. Flame Cut Tube Cross Cut
Kicker Lift: The first runner is installed 150mm above the ground surface is called kicker lift
Adjustable Base Jack: – Maximum load bearing capacity = 30KN – Lift the jack nut up (2/3) of its height.
Base Plate: – Used for distributing load – Small Square metal plates that the standard rests on to prevent them
Sole Plate: – Used to distribute the load – Large pieces of metal under the base plate to spread the